by Brad Davis | Aug 21, 2021
Master Bath Remodel This project was pretty extensive. I removed a fiberglass shower unit and replaced it with a custom tiled shower, did all the plumbing and tile work, repaired and added sub floor where needed, and tiled the floor. I also added custom closet...
by Brad Davis | Aug 21, 2021
Master Bath Remodel This project was a complete gut and start over. The only thing we left was the tub. We tiled and ship-lapped the walls, tiled the floor, added a new sink, mirror and fixtures. A total transformation for sure. See Image Gallery Below –...
by davishomepro | Aug 13, 2021
Hall Bathroom Makeover This client requested improvements to their main level hall bathroom. I removed the tile flooring, added a laminate floor, painted and wall papered the walls and installed a new toilet. See Image Gallery Below – Click Any Image To Enlarge...
by davishomepro | Aug 13, 2021
Tub Surround Removal/Tile Addition This client requested that I remove the tub surround and tile the three walls around the tub. This involved removal of the existing surround, removal of water damaged drywall, addition of concrete backer board and tile work on the...
by davishomepro | Aug 6, 2021
Master Bath Total Remodel This client requested a complete master bath remodel that included: Removal of a jetted tub, removal of an existing shower and removal of a sink and vanity Wall carpentry including framing, drywall and backerboard work Plumbing work...